top of page

LeShuttle
Folkestone
Our team delivered a off-grid solar installation for the Channel Tunnel, providing renewable power to traffic signage systems. The project supports LeShuttle’s drive to reduce carbon emissions and enhance energy resilience across its infrastructure.
Results
18 tonnes CO₂ saved annually versus diesel generation, 60% lower maintenance costs.

Senior Dene
Beverley
Our client sought a sleek, integrated solar solution that would complement their new-build property without compromising aesthetics. We designed and installed a high-performance in-roof system with battery storage that delivers clean energy, long-term savings, and a premium architectural finish.
Results
£1374 in annual energy bill savings, Over 80% in energy self-sufficiency, Seamless modern design, Property now ready for EV charging

Elloughton Dale
Elloughton

Albert Terrace
Beverley

Barn Conversion
Hexham
bottom of page